Working on a house is pretty time consuming. I had really intended to keep a really updated log of everything we're doing, but time has been short these days.
All of the horrible carpet was removed, and we decided to refinish the original pine floors in the living room and dining room. We encountered some resistant linoleum in the hallway, and contemplated just putting new flooring over it, but good taste has prevailed and we're going to do our best to strip the linoleum this weekend.
John has also demolished the highly inappropriate hearth that was constructed by the previous owner. She had built up a wood frame and put black ceramic tile on it. She did a decent job, but it just looked stupid next to the old mantle. Someday when I get around to posting pictures on here this will all make more sense.
The stairs are going to need some real work. We've got old adhesive to remove, and a small repair on a sinking step. We think we'll probably end up repainting the stairs themselves and getting a carpet runner for them, even though that's not my favorite look, but it would be easier for walking on and less noisy. And less paint stripping. The woodwork below the stairs, as well as the banister and the spindles, may be getting stripped, but we're not really thinking too much about that until we get these floors done.
The living room also has these stupid wood "brick" tiles on two walls that we'd like to remove. If I have my way, they'll be gone and the room painted before we move in, but we're down to 3 weeks so I bet that I'll be disappointed. We also have to repaint the original hearth stones on the first floor because they look pretty bad right now. And replace pretty much every exterior door on the house. And get a mailbox.